What Do You Need to Complete NEMA 14-50 Installation?
Before starting the job our techs had to deal with all the permits for the installation. Then they carrier out the installation according to the building standards. During this project we delivered:- NEMA 14-50;
- Couplings, connectors and other materials;
- Breaker for electrical panel (50A double pole);
- Conduit 1/2" or 3/4" 10 ft maximum included.