During this project our technician:
- Prepared working area according to the safety standards protocols (OSHA, NEC);
- Turned the power off;
- Run new cable and raceway from the feeder to the new outlet location (Including approved conduit and connectors for the outside/inside location);
- Installed 2 gang wire box, socket plate and proper wire connectors;
- Installed new NEMA 14-50 outlet;
- Made Electrical power testing.